Grain 400kV Substation
England and Wales, National Grid Electricity Transmission
The queue at this substation
| Project | Customer | Technology | Queued MW | Connection date | Gate | Status |
|---|---|---|---|---|---|---|
| Medway Power Station | MEDWAY POWER LIMITED | Thermal (gas, biomass, waste) | 175 | 30 Oct 2028 | Not stated | Built |
| Grain | Uniper UK Limited | Thermal (gas, biomass, waste) | 0 | Connected | Not stated | Built |
Recent changes
- GrainEngland and Wales, Thermal (gas, biomass, waste)Customer changed from C.GEN Killingholme Limited to Uniper UK Limited
- GrainEngland and Wales, Thermal (gas, biomass, waste)Customer changed from Uniper UK Limited to C.GEN Killingholme Limited
- Medway Power StationEngland and Wales, Thermal (gas, biomass, waste)Connection date moved from 30 Oct 2026 to 30 Oct 2028 (+24 months)+24 mo
- GrainEngland and Wales, Thermal (gas, biomass, waste)Stage removed (0 MW)
- Medway Power StationEngland and Wales, Thermal (gas, biomass, waste)Substation name updated in the register (from Grain GSP to Grain 400kV Substation)
- GrainEngland and Wales, Thermal (gas, biomass, waste)Technology changed from Gas (CCGT) to Gas (CCGT), Reactive compensation
- GrainEngland and Wales, Thermal (gas, biomass, waste)Restructured from 1 stage (0 MW from 10 Nov 2021) to 1 stage (0 MW)
- GrainEngland and Wales, Thermal (gas, biomass, waste)Substation name updated in the register (from Grain 400kV to Grain 400kV Substation)
- GrainEngland and Wales, Thermal (gas, biomass, waste)Technology changed from Gas (CCGT), Reactive compensation to Gas (CCGT)
- GrainEngland and Wales, Thermal (gas, biomass, waste)Technology changed from Gas (CCGT), Reactive compensation to Reactive compensation
- Medway Power StationEngland and Wales, Thermal (gas, biomass, waste)Substation name updated in the register (from Grain to Grain GSP)
- GrainEngland and Wales, Thermal (gas, biomass, waste)Technology changed from Gas (CCGT) to Gas (CCGT), Reactive compensation
- GrainEngland and Wales, Thermal (gas, biomass, waste)New stage added (0 MW from 10 Nov 2021)
- Medway Power StationEngland and Wales, Thermal (gas, biomass, waste)Capacity changed from 0 MW to 175 MW
- Medway Power StationEngland and Wales, Thermal (gas, biomass, waste)Connection date set to 30 Oct 2026
Price what a delay would do to your project
QueueWatch reports what changed in the public TEC register. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?