Lessnessock Solar Farm
Renewable Energy Systems Limited at Coylton 132/33kV Substation
- Connection date
- Left 27 Sep 2024
- Gate
- Not stated
- Status
- Scoping
- Technology
- Solar
- Total capacity
- 150 MW
- Connected now
- 0 MW
- Still to connect
- 150 MW
- Transmission owner
- SP Energy Networks (SPT)
- Agreement type
- Direct Connection
- Region
- South Scotland
- Project number
- PRO-002454
- In the register since
- September 2023
Change history
Every change to this project across 146 registers from 29 Jan 2021 to 20 Oct 2026.
- 27 Sep 2024 registerLeft the register (150 MW from 30 Jul 2030)
- 29 Sep 2023 registerAdded to the register
Also at Coylton 132/33kV
Substation view1 other project, 0 MW still to connect at this substation in total.