Wealden Works

Colbalt Energy Limited at Bolney

UKPN Embedded Capacity Register 2 – 1MW and above, October 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not stated
Status
Accepted to connect
Customer
Colbalt Energy Limited
Site name
Wealden Works
Address
Langhurstwood Road, Crawley, West Sussex, RH12 4QD
Grid reference
Easting 517747, northing 134709
Licence area
South Eastern Power Networks (SPN)
Grid supply point
Bolney
Bulk supply point
Horsham 132 KV
Primary substation
Horsham 132/11KV
Connection voltage
11 kV
Technology group
Bioenergy and waste
Energy source 1
Waste, Other: 3.1 MW registered
Registered capacity
3.1 MW
Change to maximum export capacity
3.1 MW
Change to maximum import capacity
Not stated
Flexible connection
Yes
In a connection queue
Yes
Date accepted
6 Nov 2024
Date connected
Not stated
Distribution reinforcement reference
Not published by UKPN
Transmission reinforcement reference
Not published by UKPN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
12 Jul 2024
Tracked since
October 2026 edition

Change history

Tracked since the October 2026 edition.

Changes to its status, capacity, technology or customer, newest first.

No changes to show: it has been found in one edition.

Also at Bolney

GSP view

45 other sites at this grid supply point in the October 2026 edition. In all, the sites here total 1.4 GW: 0.6 GW connected, 0.8 GW accepted to connect.

See all 45

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose