Rowley Lane
Photon Energy at Brimsdown (EPN)
UKPN Embedded Capacity Register 2 – 1MW and above, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 3 Dec 2024
- Status
- Connected
- Customer
- Photon Energy
- Site name
- Rowley Lane
- Address
- Borehamwood, Hertfordshire, WD6 1FX
- Grid reference
- Easting 521007, northing 197091
- Licence area
- Eastern Power Networks (EPN)
- Grid supply point
- Brimsdown (EPN)
- Bulk supply point
- Barnet Grid 33kV
- Primary substation
- Rowley Ln Primary 11kV
- Connection voltage
- 11 kV
- Technology group
- Solar
- Energy source 1
- Solar, Photovoltaic: 2.485 MW registered
- Registered capacity
- 2.49 MW
- Maximum export capacity
- 2.49 MW
- Maximum import capacity
- Not stated
- Flexible connection
- No
- In a connection queue
- Yes
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by UKPN
- Transmission reinforcement reference
- Not stated
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 12 Jul 2024
- Tracked since
- September 2026 edition
Change history
Tracked since the September 2026 edition, across 3 editions.
Changes to the details QueueWatch tracks, newest first.
- November 2026 editionTarget energisation date not stated (31 Oct 2033 in the October 2026 edition)
Also at Brimsdown (EPN)
GSP view8 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 270 MW: 30 MW connected, 240 MW accepted to connect.
- Abbey View NurseryGrowers CHP (South) Limited, Bioenergy and waste, Waltham Abbey Primary 11kV primaryConnected3 MW
- 33 Jeffreys RoadJohnson Matthey PLC, Gas and other fossil, Brimsdown South Grid 11kV primaryConnected2.5 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?