QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Premier Park

Syzygy Consulting at Willesden 132kV

UKPN Embedded Capacity Register 2 – 1MW and above, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not stated
Status
Accepted to connect
Customer
Syzygy Consulting
Site name
Premier Park
Address
Premier Park Road, Park Royal, London, NW10 7NZ
Grid reference
Easting 519966, northing 183422
Licence area
London Power Networks (LPN)
Grid supply point
Willesden 132kV
Bulk supply point
Not stated
Primary substation
Gibbons Rd 11kV
Connection voltage
11 kV
Technology group
Solar
Energy source 1
Solar, Photovoltaic: 6.386 MW registered
Registered capacity
6.39 MW
Change to maximum export capacity
6.39 MW
Change to maximum import capacity
0 MW
Flexible connection
No
In a connection queue
Yes
Date accepted
23 Jun 2023
Date connected
Not stated
Distribution reinforcement reference
Not published by UKPN
Transmission reinforcement reference
Not stated
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
14 Dec 2023
Tracked since
September 2026 edition

Change history

Tracked since the September 2026 edition, across 3 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at Willesden 132kV

GSP view

4 other sites at this grid supply point in the November 2026 edition, 2 of them at Gibbons Rd 11kV, the same primary substation. In all, the sites here total 157 MW: 147 MW connected, 10 MW accepted to connect.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?