Lnd Sacketts Hill Farm
GF Thanet Energy Limited at Richborough
UKPN Embedded Capacity Register 2 – 1MW and above, October 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 20 Nov 2036
- Status
- Accepted to connect
- Customer
- GF Thanet Energy Limited
- Site name
- Lnd Sacketts Hill Farm
- Address
- Land Adj Sacketts Hill Farm, Dane Court Road, Broadstairs, Kent, CT10 2QS
- Grid reference
- Easting 636900, northing 168713
- Licence area
- South Eastern Power Networks (SPN)
- Grid supply point
- Richborough
- Bulk supply point
- Thanet Grid
- Primary substation
- Thanet Grid 33kV
- Connection voltage
- 33 kV
- Technology group
- Storage
- Energy source 1
- Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 22.45 MW registered
- Registered capacity
- 22.45 MW
- Change to maximum export capacity
- 22.45 MW
- Change to maximum import capacity
- 22.45 MW
- Flexible connection
- Yes
- In a connection queue
- Yes
- Date accepted
- 2 Sep 2023
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by UKPN
- Transmission reinforcement reference
- Not published by UKPN
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 15 Apr 2024
- Tracked since
- September 2026 edition
Change history
Tracked since the September 2026 edition, across 2 editions.
Changes to its status, capacity, technology or customer, newest first.
No change to its status, capacity, technology or customer.
Also at Richborough
GSP view11 other sites at this grid supply point in the October 2026 edition, 1 of them at Thanet Grid 33kV, the same primary substation. In all, the sites here total 489 MW: 489 MW accepted to connect.
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose