Lnd Sacketts Hill Farm

GF Thanet Energy Limited at Richborough

UKPN Embedded Capacity Register 2 – 1MW and above, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
20 Nov 2036
Status
Accepted to connect
Planning consent
Granted on appeal 6 Aug 2025
Thanet, reference F/TH/24/0575 · Source: REPD
Customer
GF Thanet Energy Limited
Site name
Lnd Sacketts Hill Farm
Address
Land Adj Sacketts Hill Farm, Dane Court Road, Broadstairs, Kent, CT10 2QS
Grid reference
Easting 636900, northing 168713
Licence area
South Eastern Power Networks (SPN)
Grid supply point
Richborough
Bulk supply point
Thanet Grid
Primary substation
Thanet Grid 33kV
Connection voltage
33 kV
Technology group
Storage
Energy source 1
Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 22.45 MW registered
Registered capacity
22.45 MW
Change to maximum export capacity
22.45 MW
Change to maximum import capacity
22.45 MW
Flexible connection
Yes
In a connection queue
Yes
Date accepted
2 Sep 2023
Date connected
Not stated
Distribution reinforcement reference
Not published by UKPN
Transmission reinforcement reference
Not stated
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
15 Apr 2024
Tracked since
September 2026 edition

What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?

Change history

Tracked since the September 2026 edition, across 3 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at Richborough

GSP view

11 other sites at this grid supply point in the November 2026 edition, 1 of them at Thanet Grid 33kV, the same primary substation. In all, the sites here total 489 MW: 489 MW accepted to connect.

See all 11

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?

Planning consent

The planning decision or stage for this site, from DESNZ’s Renewable Energy Planning Database (REPD), October 2026 edition, with the planning authority and its reference. QueueWatch matched the site to that record. The register’s status can lag behind planning decisions, so the two may differ.

How QueueWatch matches projects · Spotted a wrong match? Email info@queuequant.com.