Littlebrook Substation

Hazel Capital at Littlebrook 132kV (SPN)

UKPN Embedded Capacity Register 2 – 1MW and above, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
12 Dec 2017
Status
Connected
Planning consent
Granted 12 Sep 2016
Dartford, reference 16/01136/FUL · Source: REPD
Customer
Hazel Capital
Site name
Littlebrook Substation
Address
Albion Road, Dartford, Kent, DA1 5PZ
Grid reference
Easting 555961, northing 176183
Licence area
South Eastern Power Networks (SPN)
Grid supply point
Littlebrook 132kV (SPN)
Bulk supply point
Not stated
Primary substation
Littlebrook Park 11kV
Connection voltage
11 kV
Technology group
Storage
Energy source 1
Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 8 MW registered
Registered capacity
8 MW
Maximum export capacity
8 MW
Maximum import capacity
Not stated
Flexible connection
No
In a connection queue
No
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by UKPN
Transmission reinforcement reference
Not stated
Export MPAN
1900091609075
Import MPAN
Not stated
Last updated
14 Dec 2022
Tracked since
September 2026 edition

What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?

Change history

Tracked since the September 2026 edition, across 3 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at Littlebrook 132kV (SPN)

GSP view

3 other sites at this grid supply point in the November 2026 edition, 1 of them at Littlebrook Park 11kV, the same primary substation. In all, the sites here total 318 MW: 18 MW connected, 300 MW accepted to connect.

  • LongreachThames Water Utilities Limited, Bioenergy and waste, Littlebrook Park 11kV primaryConnected2 MW
  • Southfleet Hook GreenEcoDev (South) Limited, StorageAccepted300 MW
  • Segas HouseScotia Gas Networks Limited, Gas and other fossil, Ruxley 11kV primaryConnected7.5 MW
QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?

Planning consent

The planning decision or stage for this site, from DESNZ’s Renewable Energy Planning Database (REPD), October 2026 edition, with the planning authority and its reference. QueueWatch matched the site to that record. The register’s status can lag behind planning decisions, so the two may differ.

How QueueWatch matches projects · Spotted a wrong match? Email info@queuequant.com.