Land Off A6129
EVO Energy Limited at Rye House
UKPN Embedded Capacity Register 2 – 1MW and above, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 31 Oct 2034
- Status
- Accepted to connect
- Customer
- EVO Energy Limited
- Site name
- Land Off A6129
- Address
- Great North Road, Welwyn Garden City, Hertfordshire, AL8 7TB
- Grid reference
- Easting 522300, northing 211000
- Licence area
- Eastern Power Networks (EPN)
- Grid supply point
- Rye House
- Bulk supply point
- Welwyn Grid 33kV
- Primary substation
- Welwyn Primary 11kV
- Connection voltage
- 11 kV
- Technology group
- Solar
- Energy source 1
- Solar, Photovoltaic: 7.215 MW registered
- Energy source 2
- Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 7.22 MW registered
- Registered capacity
- 7.22 MW
- Change to maximum export capacity
- 7.22 MW
- Change to maximum import capacity
- 1.5 MW
- Flexible connection
- No
- In a connection queue
- Yes
- Date accepted
- 17 Oct 2022
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by UKPN
- Transmission reinforcement reference
- Not stated
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 12 Jul 2024
- Tracked since
- September 2026 edition
Change history
Tracked since the September 2026 edition, across 3 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at Rye House
GSP view19 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 192 MW: 54 MW connected, 138 MW accepted to connect.
- Brazier Landfill SiteName withheld in the register, Bioenergy and waste, Glaxo Primary 11kV primaryConnected5.15 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?