Land At Redcoats Farm
Brockwell Storage & Solar Limited at Wymondley
UKPN Embedded Capacity Register 2 – 1MW and above, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 31 Oct 2029
- Status
- Accepted to connect
- Customer
- Brockwell Storage & Solar Limited
- Site name
- Land At Redcoats Farm
- Address
- Hitchin, Hertfordshire, SG4 7UW
- Grid reference
- Easting 520088, northing 226865
- Licence area
- Eastern Power Networks (EPN)
- Grid supply point
- Wymondley
- Bulk supply point
- Wymondley Grid 33kV
- Primary substation
- Not stated
- Connection voltage
- 33 kV
- Technology group
- Solar
- Energy source 1
- Solar, Photovoltaic: 25 MW registered
- Energy source 2
- Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 25 MW registered
- Registered capacity
- 25 MW
- Change to maximum export capacity
- 25 MW
- Change to maximum import capacity
- 12.5 MW
- Flexible connection
- No
- In a connection queue
- Yes
- Date accepted
- 19 Jul 2021
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by UKPN
- Transmission reinforcement reference
- 021847-021847
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 13 Nov 2026
- Tracked since
- September 2026 edition
Change history
Tracked since the September 2026 edition, across 3 editions.
Changes to the details QueueWatch tracks, newest first.
- November 2026 editionTarget energisation date moved from 28 Apr 2028 to 31 Oct 2029 (18 months later)
Also at Wymondley
GSP view28 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 634 MW: 236 MW connected, 398 MW accepted to connect.
- (ANM - N/A) (G) Land South Of The A602 Wymondley TipSustainability Unlimited LLP, StorageAccepted100 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?