QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Kingston Hospital

Kingston Hospital NHS Trust at Chessington

UKPN Embedded Capacity Register 2 – 1MW and above, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
18 Nov 2007
Status
Connected
Customer
Kingston Hospital NHS Trust
Site name
Kingston Hospital
Address
Galsworth Road, Kingston, Surrey, KT2 7QB
Grid reference
Easting 519542, northing 169820
Licence area
South Eastern Power Networks (SPN)
Grid supply point
Chessington
Bulk supply point
Kingston Grid 33kV
Primary substation
Kingston 11kV
Connection voltage
11 kV
Technology group
Gas and other fossil
Energy source 1
Fossil - Oil, Engine (combustion / reciprocating): 1 MW registered
Registered capacity
1 MW
Maximum export capacity
1 MW
Maximum import capacity
Not stated
Flexible connection
No
In a connection queue
No
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by UKPN
Transmission reinforcement reference
Not stated
Export MPAN
1900070699871
Import MPAN
Not stated
Last updated
14 Jul 2021
Tracked since
September 2026 edition

Change history

Tracked since the September 2026 edition, across 3 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at Chessington

GSP view

3 other sites at this grid supply point in the November 2026 edition, 1 of them at Kingston 11kV, the same primary substation. In all, the sites here total 131 MW: 3 MW connected, 128 MW accepted to connect.

  • Hogsmill StwThames Water, Gas and other fossil, Kingston 11kV primaryConnected2 MW
  • Merton CollegeLeatherhead BESS Limited C/O EKU Energy, StorageAccepted98 MW
  • Rushett LaneEnso Green Holdings F Limited, Solar, Chessington Grid 33kV primaryAccepted30 MW
QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?