Denmark Hill Drive
GTC the Electricity Network Co Limited at Mill Hill
UKPN Embedded Capacity Register 2 – 1MW and above, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- Not stated
- Status
- Accepted to connect
- Customer
- GTC the Electricity Network Co Limited
- Site name
- Denmark Hill Drive
- Address
- London, London, NW9 4BQ
- Grid reference
- Easting 522018, northing 189457
- Licence area
- Eastern Power Networks (EPN)
- Grid supply point
- Mill Hill
- Bulk supply point
- Not stated
- Primary substation
- Colindale Grid 11kV
- Connection voltage
- 11 kV
- Technology group
- Bioenergy and waste
- Energy source 1
- Biomass, Steam-gas turbine (CCGT): 1.6 MW registered
- Registered capacity
- 1.6 MW
- Change to maximum export capacity
- 1.6 MW
- Change to maximum import capacity
- Not stated
- Flexible connection
- No
- In a connection queue
- Yes
- Date accepted
- 25 Oct 2019
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by UKPN
- Transmission reinforcement reference
- Not stated
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 13 Nov 2020
- Tracked since
- September 2026 edition
Change history
Tracked since the September 2026 edition, across 3 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at Mill Hill
GSP view2 other sites at this grid supply point in the November 2026 edition, 2 of them at Colindale Grid 11kV, the same primary substation. In all, the sites here total 4 MW: 2.4 MW connected, 1.6 MW accepted to connect.
- Block E Energy Centre (G)UK Power Solutions, Gas and other fossil, Colindale Grid 11kV primaryConnected1.2 MW
- BT Colindale Telephone ExchangeBritish Telecomminications PLC, Gas and other fossil, Colindale Grid 11kV primaryConnected1.2 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?