QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Beckton Sewage Works

Beckton Sewage Works (33kV) at Barking West 33kV (LPN)

UKPN Embedded Capacity Register 2 – 1MW and above, October 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
1 Jun 2008
Status
Connected
Customer
Beckton Sewage Works (33kV)
Site name
Beckton Sewage Works
Address
Jenkins Lane, Barking, Essex, IG11 0AD
Grid reference
Easting 544385, northing 182979
Licence area
London Power Networks (LPN)
Grid supply point
Barking West 33kV (LPN)
Bulk supply point
Not stated
Primary substation
Not stated
Connection voltage
33 kV
Technology group
Bioenergy and waste
Energy source 1
Biofuel - Landfill Gas, Engine (combustion / reciprocating): 9.1 MW registered
Registered capacity
9.1 MW
Maximum export capacity
9.1 MW
Maximum import capacity
Not stated
Flexible connection
No
In a connection queue
No
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by UKPN
Transmission reinforcement reference
Not published by UKPN
Export MPAN
1298000000644
Import MPAN
Not stated
Last updated
16 May 2023
Tracked since
October 2026 edition

Change history

Tracked since the October 2026 edition.

Changes to its status, capacity, technology or customer, newest first.

No changes to show: it has been found in one edition.

Also at Barking West 33kV (LPN)

GSP view

8 other sites at this grid supply point in the October 2026 edition. In all, the sites here total 56.9 MW: 51.9 MW connected, 5 MW accepted to connect.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose