(ANM) Land Off Twinwood Road
Pathfinder Clean Energy (PACE) at Eaton Socon
UKPN Embedded Capacity Register 2 – 1MW and above, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 27 Oct 2037
- Status
- Accepted to connect
- Customer
- Pathfinder Clean Energy (PACE)
- Site name
- (ANM) Land Off Twinwood Road
- Address
- Bedford, Bedfordshire, MK41 6AB
- Grid reference
- Easting 502559, northing 254502
- Licence area
- Eastern Power Networks (EPN)
- Grid supply point
- Eaton Socon
- Bulk supply point
- Not stated
- Primary substation
- Not stated
- Connection voltage
- 132 kV
- Technology group
- Solar
- Energy source 1
- Solar, Photovoltaic: 69 MW registered
- Energy source 2
- Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 69 MW registered
- Registered capacity
- 69 MW
- Change to maximum export capacity
- 69 MW
- Change to maximum import capacity
- 69 MW
- Flexible connection
- Yes
- In a connection queue
- Yes
- Date accepted
- 24 Aug 2020
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by UKPN
- Transmission reinforcement reference
- 105027-210360
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 13 Nov 2026
- Tracked since
- September 2026 edition
Change history
Tracked since the September 2026 edition, across 3 editions.
Changes to the details QueueWatch tracks, newest first.
- November 2026 editionTarget energisation date moved from 31 Oct 2028 to 27 Oct 2037 (108 months later)
Also at Eaton Socon
GSP view40 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 950 MW: 276 MW connected, 674 MW accepted to connect.
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?