Alkane Site
Kent Renewable Energy Partnership Limited at Richborough/Sellindge 132kV
UKPN Embedded Capacity Register 2 – 1MW and above, October 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 30 Apr 2018
- Status
- Connected
- Customer
- Kent Renewable Energy Partnership Limited
- Site name
- Alkane Site
- Address
- Ramsgate Road, Sandwich, Kent, CT13 9ND
- Grid reference
- Easting 633425, northing 159472
- Licence area
- South Eastern Power Networks (SPN)
- Grid supply point
- Richborough/Sellindge 132kV
- Bulk supply point
- Richborough Grid 33kV
- Primary substation
- Not stated
- Connection voltage
- 33 kV
- Technology group
- Bioenergy and waste
- Energy source 1
- Biomass, Steam turbine (thermal power plant): 6.2 MW registered
- Registered capacity
- 6.2 MW
- Maximum export capacity
- 6.2 MW
- Maximum import capacity
- Not stated
- Flexible connection
- No
- In a connection queue
- No
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by UKPN
- Transmission reinforcement reference
- Not published by UKPN
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 12 Jul 2024
- Tracked since
- October 2026 edition
Change history
Tracked since the October 2026 edition.
Changes to its status, capacity, technology or customer, newest first.
No changes to show: it has been found in one edition.
Also at Richborough/Sellindge 132kV
GSP view29 other sites at this grid supply point in the October 2026 edition. In all, the sites here total 639 MW: 539 MW connected, 100 MW accepted to connect.
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose