QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

301 Camberwell New Road

Walworth Garage at New Cross 66kV

UKPN Embedded Capacity Register 2 – 1MW and above, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
16 Sep 2020
Status
Connected
Customer
Walworth Garage
Site name
301 Camberwell New Road
Address
Camberwell, London, SE5 0TF
Grid reference
Easting 532320, northing 176886
Licence area
London Power Networks (LPN)
Grid supply point
New Cross 66kV
Bulk supply point
Chadwick Road 33kV
Primary substation
Bengeworth Rd 11kV
Connection voltage
0.4 kV
Technology group
Storage
Energy source 1
Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 1 MW registered
Registered capacity
1 MW
Maximum export capacity
1 MW
Maximum import capacity
Not stated
Flexible connection
No
In a connection queue
No
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by UKPN
Transmission reinforcement reference
Not stated
Export MPAN
1200062596219
Import MPAN
Not stated
Last updated
14 Jul 2021
Tracked since
September 2026 edition

What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?

Change history

Tracked since the September 2026 edition, across 3 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at New Cross 66kV

GSP view

2 other sites at this grid supply point in the November 2026 edition, 2 of them at Bengeworth Rd 11kV, the same primary substation. In all, the sites here total 6.2 MW: 6.2 MW connected.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?