Units 1 & 2
At Carrington / Fiddlers Ferry
SPEN Embedded Capacity Register >1MW, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 17 Aug 2024
- Status
- Connected
- Customer
- Not stated
- Site name
- Units 1 & 2
- Address
- Omega, Warrington, Warrington, Cheshire, LL15 1NA
- Grid reference
- Easting 355539, northing 390373
- Licence area
- Merseyside, Cheshire and North Wales (SPM)
- Grid supply point
- Carrington / Fiddlers Ferry
- Bulk supply point
- DALLAM GT1 / SANKEY BRIDGES GT1 / WARRINGTON GT3
- Primary substation
- NORTH WEST WATER CAMPUS T1 / NORTH WEST WATER CAMPUS T2 / OMEGA T1 / OMEGA T2 / ORION BOULEVARD T1
- Connection voltage
- 33 kV
- Technology group
- Solar
- Energy source 1
- Solar, Photovoltaic: 1.75 MW registered
- Registered capacity
- 1.75 MW
- Maximum export capacity
- 1.75 MW
- Maximum import capacity
- 0 MW
- Flexible connection
- Not stated
- In a connection queue
- No
- Date accepted
- 3 Mar 2020
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by SPEN
- Transmission reinforcement reference
- Not stated
- Export MPAN
- 1300061528081
- Import MPAN
- 1300054986980
- Last updated
- 26 Jun 2026
- Tracked since
- March 2026 edition
Change history
Tracked since the March 2026 edition, across 7 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at Carrington / Fiddlers Ferry
GSP view26 other sites at this grid supply point in the September 2026 edition, 2 of them at NORTH WEST WATER CAMPUS T1 / NORTH WEST WATER CAMPUS T2 / OMEGA T1 / OMEGA T2 / ORION BOULEVARD T1, the same primary substation. In all, the sites here total 520 MW: 310 MW connected, 210 MW accepted to connect.
- GEN Royal Mail HubRoyal Mail, Gas and other fossil, NORTH WEST WATER CAMPUS T1 / NORTH WEST WATER CAMPUS T2 / OMEGA T1 / OMEGA T2 / ORION BOULEVARD T1 primaryConnected1.616 MW
- GEN Unit 1 Plot 7C Zone 7 Omega Warngton WA5 3TYAmazon Uk Services Ltd, Solar, NORTH WEST WATER CAMPUS T1 / NORTH WEST WATER CAMPUS T2 / OMEGA T1 / OMEGA T2 / ORION BOULEVARD T1 primaryConnected1.2 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?