Tyler Hill

FRV TH POWERTEK LIMITED at Dunbar B

SPEN Embedded Capacity Register >1MW, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
30 Mar 2028
Status
Accepted to connect
Customer
FRV TH POWERTEK LIMITED
Site name
Tyler Hill
Address
Tyller Hill, Pitcox, West Barns, Dunbar, East Lothian, EH42 1RG
Grid reference
Easting 364327, northing 676169
Licence area
Central and Southern Scotland (SPD)
Grid supply point
Dunbar B
Bulk supply point
Not stated
Primary substation
Not stated
Connection voltage
33 kV
Technology group
Storage
Energy source 1
Stored Energy, Storage - Electrochemical (Batteries): 50.96 MW registered
Registered capacity
50.96 MW
Change to maximum export capacity
49.99 MW
Change to maximum import capacity
49.99 MW
Flexible connection
Yes
In a connection queue
Yes
Date accepted
9 Mar 2023
Date connected
Not stated
Distribution reinforcement reference
Not published by SPEN
Transmission reinforcement reference
Not stated
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
29 Nov 2024
Tracked since
March 2026 edition

What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?

Change history

Tracked since the March 2026 edition, across 7 editions.

Changes to the details QueueWatch tracks, newest first.

  • June 2026 edition
    Target energisation date moved from 30 Jul 2027 to 30 Mar 2028 (8 months later)
  • May 2026 edition
    Target energisation date moved from 30 Aug 2027 to 30 Jul 2027 (1 month earlier)
  • April 2026 edition
    Target energisation date moved from 30 May 2027 to 30 Aug 2027 (3 months later)

Also at Dunbar B

GSP view

7 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 174 MW: 103 MW connected, 71 MW accepted to connect.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?