South Redhouse BESS & Solar PV

Bolshan Renewables Limited at Redhouse

SPEN Embedded Capacity Register >1MW, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
5 Feb 2021
Status
Connected
Customer
Bolshan Renewables Limited
Site name
South Redhouse BESS & Solar PV
Address
Heatherywood Road, Kirkcaldy, Fife, KY1 3NW
Grid reference
Easting 329076, northing 695364
Licence area
Central and Southern Scotland (SPD)
Grid supply point
Redhouse
Bulk supply point
Not stated
Primary substation
Not stated
Connection voltage
33 kV
Technology group
Storage
Energy source 1
Stored Energy, Storage - Electrochemical (Batteries): 23.52 MW registered
Energy source 2
Solar, Photovoltaic: 11.001 MW registered
Registered capacity
34.521 MW
Maximum export capacity
16 MW
Maximum import capacity
16 MW
Flexible connection
No
In a connection queue
No
Date accepted
24 May 2021
Target energisation date
Not stated
Distribution reinforcement reference
Not published by SPEN
Transmission reinforcement reference
Not stated
Export MPAN
1800061146886
Import MPAN
1800061146877
Last updated
30 Sep 2025
Tracked since
March 2026 edition

What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?

Change history

Tracked since the March 2026 edition, across 7 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at Redhouse

GSP view

7 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 124 MW: 67 MW connected, 57 MW accepted to connect.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?