Mersey Wharf

Welsh Power at Birkenhead

SPEN Embedded Capacity Register >1MW, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
31 Jan 2018
Status
Connected
Customer
Welsh Power
Site name
Mersey Wharf
Address
Wharf Power Limited, Mersey Wharf BusiNoess Park, Birkenhead, Wirral, CH64 4SU
Grid reference
Easting 335315, northing 384345
Licence area
Merseyside, Cheshire and North Wales (SPM)
Grid supply point
Birkenhead
Bulk supply point
BROMBOROUGH GT3 / ROCK FERRY GT2
Primary substation
Not stated
Connection voltage
33 kV
Technology group
Gas and other fossil
Energy source 1
Fossil - Gas, Steam-gas turbine (CCGT): 16.84 MW registered
Registered capacity
16.84 MW
Maximum export capacity
16.84 MW
Maximum import capacity
0.6 MW
Flexible connection
Not stated
In a connection queue
No
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by SPEN
Transmission reinforcement reference
Not stated
Export MPAN
1300060729556
Import MPAN
1300060729547
Last updated
11 Nov 2020
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 7 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at Birkenhead

GSP view

12 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 237 MW: 147 MW connected, 90 MW accepted to connect.

  • Burbo BankOrsted (formerly Dong Energy), WindConnected90 MW
  • Beaufort RoadBeaufort Road, Gas and other fossilConnected20 MW
  • Dingesmere Solar Fm 1Low Carbon UK, SolarAccepted20 MW
  • Rose CottageChint Solar UK Management Ltd, SolarAccepted20 MW
  • Cereal PartnersNestle Uk Ltd, Gas and other fossil, CEREAL PARTNERS T1 / LEVER GEORGIA AVE T1 / POOL LA T1 / UML LEVER BROMBOROUGH T2 primaryConnected4.6 MW
  • Lever SunlightLever Brothers, Gas and other fossil, LEVER SUNLIGHT primaryConnected4 MW
  • UK Waste GenerationFossil Purchasing Agency, Bioenergy and waste, LOWER BEBINGTON T1 / NEW FERRY T1 / SPITAL T1 / UNILEVER RESEARCH T1 primaryConnected3.1 MW

See all 12

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose