Melin Wynt
Ynni Lleol Cyf at Trawsfynydd
SPEN Embedded Capacity Register >1MW, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- Not stated
- Status
- Connected
- Customer
- Ynni Lleol Cyf
- Site name
- Melin Wynt
- Address
- Melin Wynt, Ty Gwyn, Corwen, Dee Valley and Mid Wales, LL21 0PU
- Grid reference
- Easting 300282, northing 346415
- Licence area
- Merseyside, Cheshire and North Wales (SPM)
- Grid supply point
- Trawsfynydd
- Bulk supply point
- FOUR CROSSES GT2 / MAENTWROG GT1 / MAENTWROG GT2
- Primary substation
- GLAN-YR-AFON T1
- Connection voltage
- 33 kV
- Technology group
- Wind
- Energy source 1
- Wind, Onshore wind turbines: 1 MW registered
- Registered capacity
- 1 MW
- Maximum export capacity
- 1 MW
- Maximum import capacity
- 0 MW
- Flexible connection
- Not stated
- In a connection queue
- No
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by SPEN
- Transmission reinforcement reference
- Not stated
- Export MPAN
- 1300060583755
- Import MPAN
- 1300060429947
- Last updated
- 11 Nov 2020
- Tracked since
- March 2026 edition
Change history
Tracked since the March 2026 edition, across 7 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at Trawsfynydd
GSP view18 other sites at this grid supply point in the September 2026 edition, 2 of them at GLAN-YR-AFON T1, the same primary substation. In all, the sites here total 144 MW: 93 MW connected, 51 MW accepted to connect.
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?