Macfarlan Smith CHP

Encora Energy Limited at Gorgie

SPEN Embedded Capacity Register >1MW, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
Not stated
Status
Connected
Customer
Encora Energy Limited
Site name
Macfarlan Smith CHP
Address
10 Wheatfield Road, Edinburgh, Edinburgh, EH11 2QA
Grid reference
Easting 322726, northing 672498
Licence area
Central and Southern Scotland (SPD)
Grid supply point
Gorgie
Bulk supply point
Not stated
Primary substation
GORGIE (11kV)
Connection voltage
11 kV
Technology group
Gas and other fossil
Energy source 1
CHP, Steam-gas turbine (CCGT): 2.028 MW registered
Registered capacity
2.028 MW
Maximum export capacity
0.99 MW
Maximum import capacity
0 MW
Flexible connection
No
In a connection queue
No
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by SPEN
Transmission reinforcement reference
Not stated
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
29 Sep 2025
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 7 editions.

Changes to the details QueueWatch tracks, newest first.

  • May 2026 edition
    Status changed from “accepted to connect” to “connected”
  • May 2026 edition
    Capacity changed from 2.478 MW to 2.028 MW
  • May 2026 edition
    Target energisation date not stated (31 Dec 2025 in the April 2026 edition)

Also at Gorgie

GSP view

No other site in SPEN’s September 2026 edition is at this grid supply point.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?