Kelvin Meadows Solar
FES Support Services Ltd at Easterhouse
SPEN Embedded Capacity Register >1MW, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 30 Apr 2029
- Status
- Accepted to connect
- Customer
- FES Support Services Ltd
- Site name
- Kelvin Meadows Solar
- Address
- Glasgow Rd, Kirkintilloch, Glasgow, G66 1AF
- Grid reference
- Easting 264828, northing 674021
- Licence area
- Central and Southern Scotland (SPD)
- Grid supply point
- Easterhouse
- Bulk supply point
- Not stated
- Primary substation
- KIRKINTILLOCH (11kV)
- Connection voltage
- 11 kV
- Technology group
- Storage
- Energy source 1
- Stored Energy, Storage - Electrochemical (Batteries): 1.3 MW registered
- Energy source 2
- Solar, Photovoltaic: 8.75 MW registered
- Registered capacity
- 10.05 MW
- Change to maximum export capacity
- 7.5 MW
- Change to maximum import capacity
- 0.2 MW
- Flexible connection
- No
- In a connection queue
- No
- Date accepted
- 29 Oct 2024
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by SPEN
- Transmission reinforcement reference
- SPT-RI-2436, SPT-RI-4191
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 11 Mar 2026
- Tracked since
- March 2026 edition
Change history
Tracked since the March 2026 edition, across 7 editions.
Changes to its status, capacity, technology or customer, newest first.
No change to its status, capacity, technology or customer.
Also at Easterhouse
GSP view1 other site at this grid supply point in the September 2026 edition. In all, the sites here total 12.1 MW: 12.1 MW accepted to connect.
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose