QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Invento A/S (Forest Lodge Estate)

FRED OLSEN LTD at Carsfad

SPEN Embedded Capacity Register >1MW, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
1 Apr 2025
Status
Connected
Customer
FRED OLSEN LTD
Site name
Invento A/S (Forest Lodge Estate)
Address
Burnhead, Castle Douglas, Dalry, Ayrshire, DG7 3XS
Grid reference
Easting 256454, northing 586097
Licence area
Central and Southern Scotland (SPD)
Grid supply point
Carsfad
Bulk supply point
Not stated
Primary substation
Not stated
Connection voltage
11 kV
Technology group
Hydro and marine
Energy source 1
Water, Hydro - Run of river: 1.2 MW registered
Registered capacity
1.2 MW
Maximum export capacity
1.2 MW
Maximum import capacity
0 MW
Flexible connection
No
In a connection queue
No
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by SPEN
Transmission reinforcement reference
Not stated
Export MPAN
1800053647830
Import MPAN
1800053647789
Last updated
29 Sep 2025
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 7 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at Carsfad

GSP view

1 other site at this grid supply point in the September 2026 edition. In all, the sites here total 13.2 MW: 13.2 MW connected.

  • CarsfadDrax Generation Enterprises Limited, Hydro and marineConnected12 MW
QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?