Greenside Farm
NEXTPOWER Development Limited at Newarthill
SPEN Embedded Capacity Register >1MW, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 28 Mar 2028
- Status
- Accepted to connect
- Customer
- NEXTPOWER Development Limited
- Site name
- Greenside Farm
- Address
- Greenside Nursery, Greenside Farm, High Street,, Newhouse, North Lanarkshire, ML1 5ST
- Grid reference
- Easting 278861, northing 661019
- Licence area
- Central and Southern Scotland (SPD)
- Grid supply point
- Newarthill
- Bulk supply point
- Not stated
- Primary substation
- Newhouse
- Connection voltage
- 33 kV
- Technology group
- Storage
- Energy source 1
- Stored Energy, Storage - Electrochemical (Batteries): 30 MW registered
- Registered capacity
- 30 MW
- Change to maximum export capacity
- 28.8 MW
- Change to maximum import capacity
- 28.8 MW
- Flexible connection
- No
- In a connection queue
- Yes
- Date accepted
- 22 Dec 2025
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by SPEN
- Transmission reinforcement reference
- SPT-RI-3497
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 5 Dec 2022
- Tracked since
- March 2026 edition
What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?
Change history
Tracked since the March 2026 edition, across 7 editions.
Changes to the details QueueWatch tracks, newest first.
- September 2026 editionTarget energisation date moved from 20 Nov 2027 to 28 Mar 2028 (4 months later)
- May 2026 editionTarget energisation date moved from 30 May 2027 to 20 Nov 2027 (6 months later)
Also at Newarthill
GSP view11 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 194 MW: 18 MW connected, 176 MW accepted to connect.
- Auchenlea LandfillEnerg (Natural Power Enpl), Bioenergy and waste, NEWHOUSE (11kV) primaryConnected2.3 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?