Dougliehill BESS
Bluestone Energy Ltd at Devol Moor
SPEN Embedded Capacity Register >1MW, June 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 30 Oct 2026
- Status
- Accepted to connect
- Customer
- Bluestone Energy Ltd
- Site name
- Dougliehill BESS
- Address
- Dougliehill WTW, Dougliehill Road, Port Glasgow, Inverclyde, PA14 5DN
- Grid reference
- Easting 230739, northing 673607
- Licence area
- Central and Southern Scotland (SPD)
- Grid supply point
- Devol Moor
- Bulk supply point
- Not stated
- Primary substation
- Not stated
- Connection voltage
- 33 kV
- Technology group
- Storage
- Energy source 1
- Stored Energy, Storage - Electrochemical (Batteries): 62.916 MW registered
- Registered capacity
- 62.916 MW
- Change to maximum export capacity
- 49 MW
- Change to maximum import capacity
- 49 MW
- Flexible connection
- Yes
- In a connection queue
- Yes
- Date accepted
- 27 Jan 2022
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by SPEN
- Transmission reinforcement reference
- SPT-RI-1968, SPT-RI-3263
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 27 Oct 2022
- Tracked since
- March 2026 edition
Change history
Tracked from the March 2026 edition to the June 2026 edition, across 4 editions.
Changes to its status, capacity, technology or customer, newest first.
- July 2026 editionNot found in this edition by its MPAN, grid reference or name and postcode
No change to its status, capacity, technology or customer.
Also at Devol Moor
GSP view4 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 69.6 MW: 45.8 MW connected, 23.8 MW accepted to connect.
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose