QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Cwm Rheidol

At Swansea North

SPEN Embedded Capacity Register >1MW, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
Not stated
Status
Connected
Customer
Not stated
Site name
Cwm Rheidol
Address
Aberystwyth, Dee Valley and Mid Wales, SY23 3NF
Grid reference
Easting 270830, northing 279290
Licence area
Merseyside, Cheshire and North Wales (SPM)
Grid supply point
Swansea North
Bulk supply point
ABERYSTWYTH GT2 / RHYDLYDAN GT1
Primary substation
RHYDLYDAN T2
Connection voltage
33 kV
Technology group
Storage
Energy source 1
Stored Energy, Storage - Mechanical - Pumped Hydro: 1 MW registered
Registered capacity
1 MW
Maximum export capacity
1 MW
Maximum import capacity
0 MW
Flexible connection
Not stated
In a connection queue
No
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by SPEN
Transmission reinforcement reference
Not stated
Export MPAN
1300061047250
Import MPAN
1300061042303
Last updated
14 Sep 2020
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 7 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at Swansea North

GSP view

9 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 167 MW: 139 MW connected, 28 MW accepted to connect.

See all 9

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose