Colton Farm (Dunfermline Solar PV & BESS)

At Dunfermline

SPEN Embedded Capacity Register >1MW, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
1 Jul 2025
Status
Connected
Customer
Not stated
Site name
Colton Farm (Dunfermline Solar PV & BESS)
Address
Land at Baldridge/Lochead, Dunfermline, Fife, KY12 0RS
Grid reference
Easting 308285, northing 690097
Licence area
Central and Southern Scotland (SPD)
Grid supply point
Dunfermline
Bulk supply point
Not stated
Primary substation
Not stated
Connection voltage
33 kV
Technology group
Storage
Energy source 1
Stored Energy, Storage - Electrochemical (Batteries): 31.356 MW registered
Energy source 2
Solar, Photovoltaic: 31.491 MW registered
Registered capacity
62.847 MW
Maximum export capacity
29.9 MW
Maximum import capacity
29.9 MW
Flexible connection
No
In a connection queue
No
Date accepted
15 Dec 2021
Target energisation date
31 Dec 2023
Distribution reinforcement reference
Not published by SPEN
Transmission reinforcement reference
Not stated
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
26 Nov 2025
Tracked since
March 2026 edition

What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?

Change history

Tracked since the March 2026 edition, across 7 editions.

Changes to the details QueueWatch tracks, newest first.

  • May 2026 edition
    Target energisation date stated as 31 Dec 2023 (not stated in the April 2026 edition)

Also at Dunfermline

GSP view

3 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 191 MW: 65 MW connected, 126 MW accepted to connect.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?