Cic, G83, International Business Gateway, Glasgow Road, Ingl
At Sighthill
SPEN Embedded Capacity Register >1MW, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- Not stated
- Status
- Accepted to connect
- Customer
- Not stated
- Site name
- Cic, G83, International Business Gateway, Glasgow Road, Ingl
- Address
- CIC, G83, International Business Gateway, Glasgow Road, Ingliston, Midlothian, EH28 8NJ
- Grid reference
- Easting 315561, northing 672475
- Licence area
- Central and Southern Scotland (SPD)
- Grid supply point
- Sighthill
- Bulk supply point
- Not stated
- Primary substation
- Not stated
- Connection voltage
- Not stated
- Technology group
- Other or not stated
- Energy source 1
- 4.648 MW registered
- Registered capacity
- 4.648 MW
- Change to maximum export capacity
- 4.648 MW
- Change to maximum import capacity
- 0 MW
- Flexible connection
- No
- In a connection queue
- No
- Date accepted
- 23 Oct 2019
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by SPEN
- Transmission reinforcement reference
- Not stated
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 14 Aug 2020
- Tracked since
- March 2026 edition
Change history
Tracked since the March 2026 edition, across 7 editions.
Changes to its status, capacity, technology or customer, newest first.
No change to its status, capacity, technology or customer.
Also at Sighthill
GSP view3 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 18.8 MW: 13.2 MW connected, 5.6 MW accepted to connect.
- Edinburgh Airport SolarAbsolute Solar and Wind Ltd, Solar, EDINBURGH AIRPORT (11kV) primaryConnected9.2 MW
- RBS GogarburnThe Royal Bank Of Scotland Plc, Gas and other fossil, EDINBURGH AIRPORT (11kV) primaryConnected4 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose