Camilla Energy Park Battery Storage
At Glenniston
SPEN Embedded Capacity Register >1MW, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 21 Dec 2023
- Status
- Connected
- Planning consent
- Granted 22 Oct 2022
Fife, reference 20/01765/ARC · Source: REPD - Customer
- Not stated
- Site name
- Camilla Energy Park Battery Storage
- Address
- Camilla Farm, Auchtertool, Kirkcaldy, Fife, KY2 5XW
- Grid reference
- Easting 320876, northing 692568
- Licence area
- Central and Southern Scotland (SPD)
- Grid supply point
- Glenniston
- Bulk supply point
- Not stated
- Primary substation
- Not stated
- Connection voltage
- 33 kV
- Technology group
- Storage
- Energy source 1
- Stored Energy, Storage - Electrochemical (Batteries): 50 MW registered
- Registered capacity
- 50 MW
- Maximum export capacity
- 49.95 MW
- Maximum import capacity
- 49.95 MW
- Flexible connection
- Yes
- In a connection queue
- No
- Date accepted
- 10 Jan 2017
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by SPEN
- Transmission reinforcement reference
- Not stated
- Export MPAN
- 1800061281734
- Import MPAN
- 1800061281725
- Last updated
- 8 Feb 2023
- Tracked since
- March 2026 edition
What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?
Change history
Tracked since the March 2026 edition, across 7 editions.
Changes to the details QueueWatch tracks, newest first.
- May 2026 editionIn a connection queue changed from “yes” to “no”
Also at Glenniston
GSP view4 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 193 MW: 137 MW connected, 56 MW accepted to connect.
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?
Planning consent
The planning decision or stage for this site, from DESNZ’s Renewable Energy Planning Database (REPD), October 2026 edition, with the planning authority and its reference. QueueWatch matched the site to that record. The register’s status can lag behind planning decisions, so the two may differ.
How QueueWatch matches projects · Spotted a wrong match? Email info@queuequant.com.