QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Caledon Green Gas

Caledon Green Generation Ltd. at Bainsford

SPEN Embedded Capacity Register >1MW, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
1 Mar 2023
Status
Connected
Customer
Caledon Green Generation Ltd.
Site name
Caledon Green Gas
Address
Land to South East of, 2 Caledon Green, Grangemouth, Stirlingshire, FK3 8TR
Grid reference
Easting 291640, northing 681035
Licence area
Central and Southern Scotland (SPD)
Grid supply point
Bainsford
Bulk supply point
Not stated
Primary substation
Not stated
Connection voltage
33 kV
Technology group
Gas and other fossil
Energy source 1
Fossil - Gas, Gas turbine (OCGT): 22.5 MW registered
Registered capacity
22.5 MW
Maximum export capacity
22.5 MW
Maximum import capacity
0 MW
Flexible connection
No
In a connection queue
No
Date accepted
26 Oct 2018
Target energisation date
Not stated
Distribution reinforcement reference
Not published by SPEN
Transmission reinforcement reference
Not stated
Export MPAN
1800061252361
Import MPAN
Not stated
Last updated
11 Oct 2023
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 7 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at Bainsford

GSP view

3 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 122 MW: 42 MW connected, 80 MW accepted to connect.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose