Bruach / Croich Hydro
Energiekontor UK Limited at Strathleven
SPEN Embedded Capacity Register >1MW, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 31 Oct 2015
- Status
- Connected
- Customer
- Energiekontor UK Limited
- Site name
- Bruach / Croich Hydro
- Address
- Bruach Hydro, Aberfoyle, Stirling, FK8 3TG
- Grid reference
- Easting 250190, northing 701120
- Licence area
- Central and Southern Scotland (SPD)
- Grid supply point
- Strathleven
- Bulk supply point
- Not stated
- Primary substation
- SSEN NETWORK
- Connection voltage
- 11 kV
- Technology group
- Hydro and marine
- Energy source 1
- Water, Hydro - Run of river: 1.5 MW registered
- Registered capacity
- 1.5 MW
- Maximum export capacity
- 1.5 MW
- Maximum import capacity
- 0 MW
- Flexible connection
- No
- In a connection queue
- No
- Date accepted
- 6 Apr 2015
- Target energisation date
- 31 Oct 2015
- Distribution reinforcement reference
- Not published by SPEN
- Transmission reinforcement reference
- Not stated
- Export MPAN
- 1700053017977
- Import MPAN
- 1700053017940
- Last updated
- 25 Oct 2022
- Tracked since
- March 2026 edition
Change history
Tracked since the March 2026 edition, across 7 editions.
Changes to the details QueueWatch tracks, newest first.
- May 2026 editionTarget energisation date stated as 31 Oct 2015 (not stated in the April 2026 edition)
Also at Strathleven
GSP view5 other sites at this grid supply point in the September 2026 edition, 4 of them at SSEN NETWORK, the same primary substation. In all, the sites here total 64 MW: 35 MW connected, 29 MW accepted to connect.
- Auchencarroch LandfillAuchencarroch Energy Ltd, Bioenergy and waste, SSEN NETWORK primaryConnected5.01 MW
- Aggreko Test FacilityAggreko Uk Limited, Gas and other fossil, STRATHLEVEN (11kV) primaryConnected6 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?