Bonnybridge BESS

Bluestone Energy LTD at Bonnybridge

SPEN Embedded Capacity Register >1MW, June 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
31 Oct 2030
Status
Accepted to connect
Customer
Bluestone Energy LTD
Site name
Bonnybridge BESS
Address
Bonnybridge Waste Water Treatment Works, A883, Bonnybridge, Falkirk, FK3 3NP
Grid reference
Easting 283710, northing 681241
Licence area
Central and Southern Scotland (SPD)
Grid supply point
Bonnybridge
Bulk supply point
Not stated
Primary substation
Not stated
Connection voltage
33 kV
Technology group
Storage
Energy source 1
Stored Energy, Storage - Electrochemical (Batteries): 62.916 MW registered, storage 62.92 MWh
Registered capacity
62.916 MW
Change to maximum export capacity
60 MW
Change to maximum import capacity
60 MW
Flexible connection
Yes
In a connection queue
Yes
Date accepted
8 Dec 2021
Date connected
Not stated
Distribution reinforcement reference
Not published by SPEN
Transmission reinforcement reference
Not stated
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
14 Jul 2020
Tracked since
March 2026 edition

Change history

Tracked from the March 2026 edition to the June 2026 edition, across 4 editions.

Changes to its status, capacity, technology or customer, newest first.

  • July 2026 edition
    Not found in this edition by its MPAN, grid reference or name and postcode

No change to its status, capacity, technology or customer.

Also at Bonnybridge

GSP view

9 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 138 MW: 70 MW connected, 68 MW accepted to connect.

See all 9

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose