Benthead Farm Solar and BESS
Locogen Solar Developments Ltd at Kilwinning
SPEN Embedded Capacity Register >1MW, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 1 Oct 2026
- Status
- Accepted to connect
- Customer
- Locogen Solar Developments Ltd
- Site name
- Benthead Farm Solar and BESS
- Address
- Benthead Farm, Kilwinning, North Ayrshire, KA13 7RU
- Grid reference
- Easting 233599, northing 646633
- Licence area
- Central and Southern Scotland (SPD)
- Grid supply point
- Kilwinning
- Bulk supply point
- Not stated
- Primary substation
- Not stated
- Connection voltage
- 33 kV
- Technology group
- Storage
- Energy source 1
- Stored Energy, Storage - Electrochemical (Batteries): 39.51 MW registered
- Energy source 2
- Solar, Photovoltaic: 73.92 MW registered
- Registered capacity
- 113.43 MW
- Change to maximum export capacity
- 63 MW
- Change to maximum import capacity
- 31.1 MW
- Flexible connection
- Yes
- In a connection queue
- Yes
- Date accepted
- 29 Aug 2024
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by SPEN
- Transmission reinforcement reference
- Not stated
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 28 Mar 2023
- Tracked since
- March 2026 edition
What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?
Change history
Tracked since the March 2026 edition, across 7 editions.
Changes to the details QueueWatch tracks, newest first.
- September 2026 editionCapacity changed from 70.4 MW to 113.43 MW
- September 2026 editionTarget energisation date moved from 18 Sep 2026 to 1 Oct 2026 (13 days later)
- August 2026 editionTarget energisation date moved from 13 Aug 2026 to 18 Sep 2026 (1 month later)
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?