Aberangell Farm

GGE Scotland Limited at Mid Wales

SPEN Embedded Capacity Register >1MW, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
21 Aug 2028
Status
Accepted to connect
Customer
GGE Scotland Limited
Site name
Aberangell Farm
Address
Dol Fawr, Llanbrynmair, Powys, SY20 9ND
Grid reference
Easting 288707, northing 306605
Licence area
Merseyside, Cheshire and North Wales (SPM)
Grid supply point
Mid Wales
Bulk supply point
Not stated
Primary substation
Not stated
Connection voltage
132 kV
Technology group
Solar
Energy source 1
Solar, Photovoltaic: 16 MW registered
Energy source 2
Stored Energy, Storage - Electrochemical (Batteries): 50 MW registered
Energy source 3
Wind, Onshore wind turbines: 84 MW registered
Registered capacity
150 MW
Change to maximum export capacity
100 MW
Change to maximum import capacity
50 MW
Flexible connection
Not stated
In a connection queue
Yes
Date accepted
14 Mar 2024
Date connected
Not stated
Distribution reinforcement reference
Not published by SPEN
Transmission reinforcement reference
Not stated
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
28 Aug 2024
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 7 editions.

Changes to the details QueueWatch tracks, newest first.

  • July 2026 edition
    Technology changed from Wind to Solar
  • June 2026 edition
    Technology changed from Storage to Wind
  • April 2026 edition
    Technology changed from Wind to Storage

Also at Mid Wales

GSP view

No other site in SPEN’s September 2026 edition is at this grid supply point.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?