QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.
Distribution / SPEN / Grid supply point

Wylfa

Grid supply point in Merseyside, Cheshire and North Wales (SPM)

SPEN Embedded Capacity Register >1MW, September 2026 edition

12sites of 1 MW and over
177 MWcapacity
141 MWconnected (10 sites)
36 MWaccepted to connect (2 sites)

Capacity by technology

TechnologySitesCapacityConnectedAccepted to connect
Solar5115 MW80 MW35 MW
Wind440.3 MW40.3 MW–
Hydro and marine118 MW18 MW–
Bioenergy and waste23.1 MW3.1 MW–

Storage capacity in MWh: not published by SPEN.

Each site is grouped by its first energy source, as the register names it.

How busy is each primary substation?

Each primary substation at this grid supply point in the September 2026 edition, under the bulk supply point its register gives. Select a row to see its sites.

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Primary substationBulk supply pointSitesConnectedAccepted to connect
AMLWCH GT1 / CAERGEILIOG GT1 / GT214.6 MW–
AMLWCH GT1 / CAERGEILIOG GT1 / GT212 MW–
AMLWCH GT1 / CAERGEILIOG GT1 / GT211.1 MW–
AMLWCH GT1 / CAERGEILIOG GT1 / GT2884 MW35 MW
AMLWCH GT1 / CAERGEILIOG GT1149.9 MW–

Not found in SPEN's September 2026 edition

3 sites last found at this grid supply point were not found in this edition by their MPAN, grid reference or name and postcode. QueueWatch keeps their pages for six months and does not say whether they have left the register.

What changed recently

Changes to the sites here found in both of two consecutive monthly editions, the latest first.

August 2026 edition to September 2026 edition: 11 sites matched. 2 sites at this grid supply point couldn't be matched between the two editions, because their details changed or they appear in only one.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

How power reaches a site

A grid supply point (GSP) is where the national grid hands power to the local network. A bulk supply point (BSP) steps it down to a lower voltage for an area. A primary substation steps it down again for the streets and sites nearby. Most small and medium sites connect at a primary. Not every network has all three levels.