QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

WINDBURN WIND FARM 75MW WIND, 35MW BESS

At BRACO WEST GRID

SSEN Embedded Capacity Register, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
31 Oct 2035
Status
Accepted to connect
Customer
Not stated
Site name
WINDBURN WIND FARM 75MW WIND, 35MW BESS
Address
WINDBURN WIND FARM, AUCHTERARDER, PERTHSHIRE AND KINROSS, PH4 1QT
Grid reference
Easting 286922, northing 706612
Licence area
North of Scotland (SHEPD)
Grid supply point
BRACO WEST GRID
Bulk supply point
Not stated
Primary substation
Not stated
Connection voltage
33 kV
Technology group
Wind
Energy source 1
WIND, ONSHORE WIND TURBINES: 110 MW registered
Registered capacity
110 MW
Change to maximum export capacity
75 MW
Change to maximum import capacity
35 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
21 Dec 2023
Date connected
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
10 Feb 2026
Tracked since
January 2024 edition

Change history

Tracked since the January 2024 edition, across 35 editions.

Changes to the details QueueWatch tracks, newest first.

  • November 2025 edition
    Target energisation date stated as 31 Oct 2035 (not stated in the October 2025 edition)

Also at BRACO WEST GRID

GSP view

9 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 328 MW: 33 MW connected, 295 MW accepted to connect.

See all 9

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?