CALZIEVEG BESS 50MW

At BRACO

SSEN Embedded Capacity Register, July 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
31 May 2035
Status
Accepted to connect
Customer
Not stated
Site name
CALZIEVEG BESS 50MW
Address
CALZIEVEG, BRACO, DUNBLANE, PERTHSHIRE, FK15 9RD
Grid reference
Easting 281345, northing 709253
Licence area
North of Scotland (SHEPD)
Grid supply point
BRACO
Bulk supply point
Not stated
Primary substation
BRACO GRID
Connection voltage
33 kV
Technology group
Storage
Energy source 1
STORED ENERGY (ALL STORED ENERGY IRRESPECTVE OF THE ORIGINAL ENERGY SOURCE), STORAGE - ELECTROCHEMICAL (BATTERIES): 51.75 MW registered
Registered capacity
51.75 MW
Change to maximum export capacity
50 MW
Change to maximum import capacity
50.5 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
19 Mar 2024
Date connected
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
10 Feb 2026
Tracked since
March 2024 edition

Change history

Tracked from the March 2024 edition to the July 2026 edition, across 29 editions.

Changes to its status, capacity, technology or customer, newest first.

  • August 2026 edition
    Not found in this edition by its MPAN, grid reference or name and postcode
  • April 2024 edition
    Capacity changed from 34.978 MW to 51.75 MW
  • April 2024 edition
    Technology changed from Solar to Storage

Also at BRACO

GSP view

5 other sites at this grid supply point in the September 2026 edition, 1 of them at BRACO GRID, the same primary substation. In all, the sites here total 133 MW: 78 MW connected, 55 MW accepted to connect.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose