QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

ST LAND ADJ

SUSI EELPOWER WINCHESTER LIMITED at NURSLING GSP

SSEN Embedded Capacity Register, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
Not stated
Status
Connected
Customer
SUSI EELPOWER WINCHESTER LIMITED
Site name
ST LAND ADJ
Address
TO B3DATA NOT AVAILABLE49, STOCKBRIDGE ROAD, ARGYLL
Grid reference
Easting 446000, northing 128600
Licence area
Southern England (SEPD)
Grid supply point
NURSLING GSP
Bulk supply point
WINCHESTER
Primary substation
HARESTOCK BATTERY STORAGE
Connection voltage
33 kV
Technology group
Storage
Energy source 1
STORED ENERGY (ALL STORED ENERGY IRRESPECTVE OF THE ORIGINAL ENERGY SOURCE), STORAGE - ELECTROCHEMICAL (BATTERIES): 9.5 MW registered
Registered capacity
9.5 MW
Maximum export capacity
9.5 MW
Maximum import capacity
Not stated
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
2000060127123
Import MPAN
2000060127114
Last updated
12 Feb 2026
Tracked since
August 2023 edition

What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?

Change history

Tracked since the August 2023 edition, across 40 editions.

Changes to the details QueueWatch tracks, newest first.

  • April 2025 edition
    Technology stated as Storage (not stated in the March 2025 edition)
  • November 2023 edition
    Capacity changed from 10 MW to 9.5 MW

Also at NURSLING GSP

GSP view

37 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 1.4 GW: 0.2 GW connected, 1.2 GW accepted to connect.

See all 37

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?