SLOY POWER STATION
At SLOY
SSEN Embedded Capacity Register, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 31 Mar 2002
- Status
- Connected
- Customer
- Not stated
- Site name
- SLOY POWER STATION
- Address
- ARROCHAR, ARGYLL AND BUTE, G83 7DP
- Grid reference
- Easting 231986, northing 709355
- Licence area
- North of Scotland (SHEPD)
- Grid supply point
- SLOY
- Bulk supply point
- Not stated
- Primary substation
- SLOY POWER STATION
- Connection voltage
- 11 kV
- Technology group
- Hydro and marine
- Energy source 1
- WATER, HYDRO - OTHER: 160 MW registered
- Registered capacity
- 160 MW
- Maximum export capacity
- 72.5 MW
- Maximum import capacity
- Not stated
- Flexible connection
- Not stated
- In a connection queue
- Not published by SSEN
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 12 Feb 2026
- Tracked since
- October 2025 edition
Change history
Tracked since the October 2025 edition, across 14 editions.
Changes to the details QueueWatch tracks, newest first.
- February 2026 editionExport capacity changed from 160 MW to 72.5 MW
Also at SLOY
GSP view3 other sites at this grid supply point in the November 2026 edition, 2 of them at SLOY POWER STATION, the same primary substation. In all, the sites here total 167 MW: 167 MW connected.
- DARROCH POWER LIMITEDDARROCH POWER LIMITED, Hydro and marine, SLOY POWER STATION primaryConnected2.803 MW
- BEN GLAS POWER LIMITEDBEN GLAS POWER LIMITED, Hydro and marine, SLOY POWER STATION primaryConnected1.9 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?