FLAXLANDS MANOR FARM
At MINETY GSP
SSEN Embedded Capacity Register, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 22 Jun 2037
- Status
- Accepted to connect
- Customer
- Not stated
- Site name
- FLAXLANDS MANOR FARM
- Address
- FLAXLANDS MANOR FARM, FLAXLANDS ROYAL WOOTTON BASSETT, SWINDON, WILTSHIRE, SN4 8DY
- Grid reference
- Easting 406667, northing 185044
- Licence area
- Southern England (SEPD)
- Grid supply point
- MINETY GSP
- Bulk supply point
- SWINDON
- Primary substation
- Not stated
- Connection voltage
- 132 kV
- Technology group
- Other or not stated
- Energy source 1
- OTHER, OTHER: 114.74 MW registered
- Registered capacity
- 114.74 MW
- Change to maximum export capacity
- 49.9 MW
- Change to maximum import capacity
- 53.053 MW
- Flexible connection
- Not stated
- In a connection queue
- Not published by SSEN
- Date accepted
- 14 Aug 2024
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 10 Feb 2026
- Tracked since
- December 2024 edition
Change history
Tracked since the December 2024 edition, across 22 editions.
Changes to its status, capacity, technology or customer, newest first.
No change to its status, capacity, technology or customer.
Also at MINETY GSP
GSP view59 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 1.4 GW: 0.6 GW connected, 0.8 GW accepted to connect.
- PURLIEUS BATTERY STORAGEMINETY SOUTH STORAGE EXPORT, Storage, MINETY BATTERY STORAGE primaryConnected94.991 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose