BRENTFORD F C TRAINING GROUND 100

At EALING GSP

SSEN Embedded Capacity Register, October 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
31 Oct 2038
Status
Accepted to connect
Customer
Not stated
Site name
BRENTFORD F C TRAINING GROUND 100
Address
BRENTFORD F C TRAINING GROUND 100, JERSEY ROAD, HOUNSLOW, GREATER LONDON, TW5 0TP
Grid reference
Easting 513969, northing 177164
Licence area
Southern England (SEPD)
Grid supply point
EALING GSP
Bulk supply point
Not stated
Primary substation
BRIDGE ROAD
Connection voltage
66 kV
Technology group
Other or not stated
Energy source 1
OTHER, OTHER: 120 MW registered
Registered capacity
120 MW
Change to maximum export capacity
120 MW
Change to maximum import capacity
126.316 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
19 Jul 2024
Date connected
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
10 Feb 2026
Tracked since
August 2024 edition

Change history

Tracked since the August 2024 edition, across 27 editions.

Changes to the details QueueWatch tracks, newest first.

  • November 2025 edition
    Target energisation date stated as 31 Oct 2038 (not stated in the October 2025 edition)

Also at EALING GSP

GSP view

No other site in SSEN’s October 2026 edition is at this grid supply point.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose