SANDWICK NORTH WIND GENERATING STATION
XERO ENERGY LIMITED at ARDMORE GRID
SSEN Embedded Capacity Register, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 28 Feb 2031
- Status
- Accepted to connect
- Planning consent
- Granted 5 Nov 2019
Na h-Eileanan Siar · Source: REPD - Customer
- XERO ENERGY LIMITED
- Site name
- SANDWICK NORTH WIND GENERATING STATION
- Address
- SANDWICK NORTH WIND GENERATING STATION SANDWICK, ISLE OF LEWIS, EILEAN SIAR, HS2 9JW
- Grid reference
- Easting 138346, northing 930501
- Licence area
- North of Scotland (SHEPD)
- Grid supply point
- ARDMORE GRID
- Bulk supply point
- Not stated
- Primary substation
- STORNOWAY GRID
- Connection voltage
- 33 kV
- Technology group
- Wind
- Energy source 1
- WIND, ONSHORE WIND TURBINES: 5 MW registered
- Registered capacity
- 5 MW
- Change to maximum export capacity
- 5 MW
- Change to maximum import capacity
- 0.201 MW
- Flexible connection
- Not stated
- In a connection queue
- Not published by SSEN
- Date accepted
- 13 Feb 2019
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 10 Feb 2026
- Tracked since
- August 2023 edition
Change history
Tracked since the August 2023 edition, across 40 editions.
Changes to the details QueueWatch tracks, newest first.
- November 2025 editionTarget energisation date stated as 28 Feb 2031 (not stated in the October 2025 edition)
Also at ARDMORE GRID
GSP view29 other sites at this grid supply point in the November 2026 edition, 9 of them at STORNOWAY GRID, the same primary substation. In all, the sites here total 258 MW: 79 MW connected, 179 MW accepted to connect.
- DRUIM LEATHANN WINDFARM LIMITEDDRUIM LEATHANN WINDFARM LIMITED, Wind, STORNOWAY GRID primaryAccepted49.7 MW
- PENTLAND ROAD WIND FARM LTDPENTLAND ROAD WIND FARM LTD, Wind, STORNOWAY GRID primaryConnected13.775 MW
- ARNISH MOOR WIND FARM ADDCAPPARTNERSHIP FOR RENEWABLES LIMITED, Wind, STORNOWAY GRID primaryAccepted3 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?
Planning consent
The planning decision or stage for this site, from DESNZ’s Renewable Energy Planning Database (REPD), October 2026 edition, with the planning authority and its reference. QueueWatch matched the site to that record. The register’s status can lag behind planning decisions, so the two may differ.
How QueueWatch matches projects · Spotted a wrong match? Email info@queuequant.com.