POWER STATION
SLOUGH HEAT & POWER LIMITED at IVER 132KV
SSEN Embedded Capacity Register, October 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- Not stated
- Status
- Connected
- Customer
- SLOUGH HEAT & POWER LIMITED
- Site name
- POWER STATION
- Address
- CIRCUIT GEN 23, EDINGBURGH AVENUE, SLOUGH, BERKSHIRE, SL1 4QD
- Grid reference
- Easting 495286, northing 181512
- Licence area
- Southern England (SEPD)
- Grid supply point
- IVER 132KV
- Bulk supply point
- SLOUGH
- Primary substation
- Not stated
- Connection voltage
- 33 kV
- Technology group
- Solar
- Energy source 1
- SOLAR, PHOTOVOLTAIC: 8 MW registered
- Registered capacity
- 8 MW
- Maximum export capacity
- 7.6 MW
- Maximum import capacity
- Not stated
- Flexible connection
- Not stated
- In a connection queue
- Not published by SSEN
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- 2000057861030
- Import MPAN
- 2000057861011
- Last updated
- 12 Feb 2026
- Tracked since
- August 2023 edition
Change history
Tracked since the August 2023 edition, across 38 editions. Not found at 1 MW or over in the November 2023 edition.
Changes to the details QueueWatch tracks, newest first.
- December 2023 editionCapacity stated as 8 MW (not stated in the October 2023 edition)
- December 2023 editionTechnology stated as Solar (not stated in the October 2023 edition)
- November 2023 editionNot found among this edition’s sites of 1 MW and over by its MPAN, grid reference or name and postcode
Also at IVER 132KV
GSP view19 other sites at this grid supply point in the October 2026 edition. In all, the sites here total 281 MW: 178 MW connected, 103 MW accepted to connect.
- LAKESIDE ENERGY FROM WASTE LIMITEDNFPA (APRIL 2DATA NOT AVAILABLE2DATA NOT AVAILABLE), Bioenergy and waste, LAKESIDE primaryConnected43.415 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose