QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

MEMBURY PV

At BRAMLEY (THAT-AMES)

SSEN Embedded Capacity Register, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
16 Mar 2015
Status
Connected
Planning consent
Granted 27 May 2014
West Berkshire, reference 14/00385/COMIND · Source: REPD
Customer
Not stated
Site name
MEMBURY PV
Address
HADLEY FARM MEMBURY SOLAR PV, ERMIN STREET, HUNGERFORD, BERKSHIRE, RG17 7TR
Grid reference
Easting 430689, northing 176506
Licence area
Southern England (SEPD)
Grid supply point
BRAMLEY (THAT-AMES)
Bulk supply point
THATCHAM
Primary substation
MEMBURY PV
Connection voltage
33 kV
Technology group
Solar
Energy source 1
SOLAR, PHOTOVOLTAIC: 13.3 MW registered
Registered capacity
13.3 MW
Maximum export capacity
13.3 MW
Maximum import capacity
Not stated
Flexible connection
No
In a connection queue
Not published by SSEN
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
2000056204965
Import MPAN
2000056204956
Last updated
12 Feb 2026
Tracked since
August 2023 edition

Change history

Tracked since the August 2023 edition, across 40 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at BRAMLEY (THAT-AMES)

GSP view

13 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 170 MW: 56 MW connected, 114 MW accepted to connect.

See all 13

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?

Planning consent

The planning decision or stage for this site, from DESNZ’s Renewable Energy Planning Database (REPD), October 2026 edition, with the planning authority and its reference. QueueWatch matched the site to that record. The register’s status can lag behind planning decisions, so the two may differ.

How QueueWatch matches projects · Spotted a wrong match? Email info@queuequant.com.