QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

MELMANNOCH HILL WIND FARM

MELMANNOCH HILL WIND FARM at FETTERSSO GRID

SSEN Embedded Capacity Register, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
31 Jan 2033
Status
Accepted to connect
Customer
MELMANNOCH HILL WIND FARM
Site name
MELMANNOCH HILL WIND FARM
Address
HAREHILL FOREST, BANCHORY, ABERDEENSHIRE, AB31 6LP
Grid reference
Easting 366255, northing 791126
Licence area
North of Scotland (SHEPD)
Grid supply point
FETTERSSO GRID
Bulk supply point
Not stated
Primary substation
FETTERSSO GRID
Connection voltage
132 kV
Technology group
Wind
Energy source 1
WIND, ONSHORE WIND TURBINES: 44.5 MW registered
Registered capacity
44.5 MW
Change to maximum export capacity
0.816 MW
Change to maximum import capacity
0.816 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
24 Feb 2026
Date connected
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
12 Mar 2026
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 7 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at FETTERSSO GRID

GSP view

5 other sites at this grid supply point in the September 2026 edition, 4 of them at FETTERSSO GRID, the same primary substation. In all, the sites here total 300 MW: 71 MW connected, 229 MW accepted to connect.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose