LOCHEND WIND
WIND HARVEST LIMITED at THURSO SOUTH GRID
SSEN Embedded Capacity Register, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 29 May 2028
- Status
- Accepted to connect
- Customer
- WIND HARVEST LIMITED
- Site name
- LOCHEND WIND
- Address
- LOCHEND WIND, LOCHEND DUNNET, THURSO, HIGHLAND, KW14 8TA
- Grid reference
- Easting 326683, northing 968129
- Licence area
- North of Scotland (SHEPD)
- Grid supply point
- THURSO SOUTH GRID
- Bulk supply point
- Not stated
- Primary substation
- THURSO SOUTH GRID
- Connection voltage
- 33 kV
- Technology group
- Wind
- Energy source 1
- WIND, ONSHORE WIND TURBINES: 12.2 MW registered
- Registered capacity
- 12.2 MW
- Change to maximum export capacity
- 12.2 MW
- Change to maximum import capacity
- 0.018 MW
- Flexible connection
- Not stated
- In a connection queue
- Not published by SSEN
- Date accepted
- 1 Jul 2021
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 10 Feb 2026
- Tracked since
- September 2026 edition
Change history
Tracked since the September 2026 edition.
Another record at this location is on a separate page.
Changes to its status, capacity, technology or customer, newest first.
No changes to show: it has been found in one edition.
Also at THURSO SOUTH GRID
GSP view19 other sites at this grid supply point in the September 2026 edition, 14 of them at THURSO SOUTH GRID, the same primary substation. In all, the sites here total 436 MW: 81 MW connected, 355 MW accepted to connect.
- GLENGOLLY FARM BATTERY STORAGEECOCEL ENERGY (STORAGE) LTD, Storage, THURSO SOUTH GRID primaryAccepted50 MW
- OLRIG MAINS FARM WIND AND BESSGREEN SWITCH CAPITAL LIMITED, Storage, THURSO SOUTH GRID primaryAccepted34.4 MW
- BURGAR HILL REPOWERING WIND FARMBURGAR HILL RENEWABLES LIMITED, Wind, THURSO SOUTH GRID primaryAccepted30 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose