GLENGOLLY FARM BATTERY STORAGE
ECOCEL ENERGY (STORAGE) LTD at THURSO SOUTH GRID
SSEN Embedded Capacity Register, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 31 Oct 2031
- Status
- Accepted to connect
- Planning consent
- Granted on appeal 30 Sep 2025
Highland, reference 24/00561/FUL · Source: REPD - Customer
- ECOCEL ENERGY (STORAGE) LTD
- Site name
- GLENGOLLY FARM BATTERY STORAGE
- Address
- GLENGOLLY FARM, THURSO, HIGHLAND, KW14 7XP
- Grid reference
- Easting 310132, northing 965724
- Licence area
- North of Scotland (SHEPD)
- Grid supply point
- THURSO SOUTH GRID
- Bulk supply point
- Not stated
- Primary substation
- THURSO SOUTH GRID
- Connection voltage
- 33 kV
- Technology group
- Storage
- Energy source 1
- STORED ENERGY (ALL STORED ENERGY IRRESPECTVE OF THE ORIGINAL ENERGY SOURCE), STORAGE - ELECTROCHEMICAL (BATTERIES): 50 MW registered
- Registered capacity
- 50 MW
- Change to maximum export capacity
- 49.9 MW
- Change to maximum import capacity
- 55.291 MW
- Flexible connection
- Not stated
- In a connection queue
- Not published by SSEN
- Date accepted
- 25 Aug 2023
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 10 Feb 2026
- Tracked since
- September 2023 edition
What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?
Change history
Tracked since the September 2023 edition, across 38 editions. Not found at 1 MW or over in the November 2023 edition.
Changes to the details QueueWatch tracks, newest first.
- November 2025 editionTarget energisation date stated as 31 Oct 2031 (not stated in the October 2025 edition)
- November 2023 editionNot found among this edition’s sites of 1 MW and over by its MPAN, grid reference or name and postcode
Also at THURSO SOUTH GRID
GSP view19 other sites at this grid supply point in the November 2026 edition, 14 of them at THURSO SOUTH GRID, the same primary substation. In all, the sites here total 436 MW: 81 MW connected, 355 MW accepted to connect.
- OLRIG MAINS FARM WIND AND BESSGREEN SWITCH CAPITAL LIMITED, Storage, THURSO SOUTH GRID primaryAccepted34.4 MW
- BURGAR HILL REPOWERING WIND FARMBURGAR HILL RENEWABLES LIMITED, Wind, THURSO SOUTH GRID primaryAccepted30 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?
Planning consent
The planning decision or stage for this site, from DESNZ’s Renewable Energy Planning Database (REPD), October 2026 edition, with the planning authority and its reference. QueueWatch matched the site to that record. The register’s status can lag behind planning decisions, so the two may differ.
How QueueWatch matches projects · Spotted a wrong match? Email info@queuequant.com.