LOCH CARNAN COMMUNITY WIND PHASE 2

SOUTH UIST ESTATE at ARDMORE GRID

SSEN Embedded Capacity Register, October 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
28 Feb 2031
Status
Accepted to connect
Customer
SOUTH UIST ESTATE
Site name
LOCH CARNAN COMMUNITY WIND PHASE 2
Address
LOCH CARNAN COMMUNITY WIND PHASE 2, ISLE OF SOUTH UIST, WESTERN ISLES
Grid reference
Not stated
Licence area
North of Scotland (SHEPD)
Grid supply point
ARDMORE GRID
Bulk supply point
Not stated
Primary substation
LOCH CARNAN
Connection voltage
33 kV
Technology group
Wind
Energy source 1
WIND, ONSHORE WIND TURBINES: 6.9 MW registered
Registered capacity
6.9 MW
Change to maximum export capacity
6.9 MW
Change to maximum import capacity
0 MW
Flexible connection
No
In a connection queue
Not published by SSEN
Date accepted
6 Aug 2013
Date connected
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
10 Feb 2026
Tracked since
August 2023 edition

Change history

Tracked since the August 2023 edition, across 39 editions.

Changes to the details QueueWatch tracks, newest first.

  • November 2025 edition
    Target energisation date stated as 28 Feb 2031 (not stated in the October 2025 edition)

Also at ARDMORE GRID

GSP view

29 other sites at this grid supply point in the October 2026 edition, 6 of them at LOCH CARNAN, the same primary substation. In all, the sites here total 258 MW: 79 MW connected, 179 MW accepted to connect.

  • LOCH CARNAN COMMUNITYSOUTH UIST RENEWABLE ENERGY LTD, Solar, LOCH CARNAN primaryConnected7.5 MW
  • LOCH CARNON G1SSE GENERATION LTD, Gas and other fossil, LOCH CARNAN primaryConnected2.28 MW
  • LOCH CARNON G2SSE GENERATION LTD, Gas and other fossil, LOCH CARNAN primaryConnected2.28 MW
  • LOCH CARNON G3SSE GENERATION LTD, Gas and other fossil, LOCH CARNAN primaryConnected2.28 MW
  • LOCH CARNON G4SSE GENERATION LTD, Gas and other fossil, LOCH CARNAN primaryConnected2.28 MW
  • LOCH CARNON G5SSE GENERATION LTD, Gas and other fossil, LOCH CARNAN primaryConnected2.28 MW
  • DRUIM LEATHANN WINDFARM LIMITEDDRUIM LEATHANN WINDFARM LIMITED, Wind, STORNOWAY GRID primaryAccepted49.7 MW
  • WCCEC WIND FARMWEST COAST COMMUNITY ENERGY LTD., Wind, STORNOWAY GRID primaryAccepted45 MW

See all 29

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose