LAND AT ARDGOUR ESTATE

At FORT WILLIAM

SSEN Embedded Capacity Register, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
17 May 2028
Status
Accepted to connect
Customer
Not stated
Site name
LAND AT ARDGOUR ESTATE
Address
LAND AT ARDGOUR ESTATE, HIGHLANDS, HIGHLAND, PH33 7AG
Grid reference
Easting 200501, northing 763345
Licence area
North of Scotland (SHEPD)
Grid supply point
FORT WILLIAM
Bulk supply point
Not stated
Primary substation
FORT WILLIAM GRID
Connection voltage
33 kV
Technology group
Storage
Energy source 1
STORED ENERGY (ALL STORED ENERGY IRRESPECTVE OF THE ORIGINAL ENERGY SOURCE), STORAGE - ELECTROCHEMICAL (BATTERIES): 1.5 MW registered
Registered capacity
1.5 MW
Change to maximum export capacity
1.5 MW
Change to maximum import capacity
0.011 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
5 Jun 2023
Date connected
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
10 Feb 2026
Tracked since
August 2023 edition

Change history

Tracked since the August 2023 edition, across 38 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at FORT WILLIAM

GSP view

8 other sites at this grid supply point in the September 2026 edition, 6 of them at FORT WILLIAM GRID, the same primary substation. In all, the sites here total 16.5 MW: 15 MW connected, 1.5 MW accepted to connect.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose