HADDO WINDFARM
HADDO ENERGY LIMITED at KINTORE
SSEN Embedded Capacity Register, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- Not stated
- Status
- Connected
- Customer
- HADDO ENERGY LIMITED
- Site name
- HADDO WINDFARM
- Address
- METHLICK, ELLON, ABERDEENSHIRE, AB41 7DX
- Grid reference
- Easting 383410, northing 837660
- Licence area
- North of Scotland (SHEPD)
- Grid supply point
- KINTORE
- Bulk supply point
- Not stated
- Primary substation
- KINTORE GRID
- Connection voltage
- 33 kV
- Technology group
- Wind
- Energy source 1
- WIND, ONSHORE WIND TURBINES: 4.37 MW registered
- Registered capacity
- 4.37 MW
- Maximum export capacity
- 4.37 MW
- Maximum import capacity
- Not stated
- Flexible connection
- No
- In a connection queue
- Not published by SSEN
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- 1700052478877
- Import MPAN
- 1700052478868
- Last updated
- 12 Feb 2026
- Tracked since
- August 2023 edition
Change history
Tracked since the August 2023 edition, across 38 editions.
Changes to its status, capacity, technology or customer, newest first.
No change to its status, capacity, technology or customer.
Also at KINTORE
GSP view21 other sites at this grid supply point in the September 2026 edition, 13 of them at KINTORE GRID, the same primary substation. In all, the sites here total 573 MW: 96 MW connected, 477 MW accepted to connect.
- THAINSTONE ENERGY PARK ERFAGILE ENERGY RECOVERY (INVERURIE) LIMITED, Other or not stated, KINTORE GRID primaryAccepted55 MW
- PENNON POWER ABERDEENSHIRE LIMITEDPENNON POWER ABERDEENSHIRE LIMITED, Solar, KINTORE GRID primaryConnected8.75 MW
- KIRKTON FARM WIND TURBINE PROJECTCULSALMOND AIR LIMITED, Wind, KINTORE GRID primaryConnected6.555 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose